A 250 mm thick concrete slab weighs about 600 kg per square metre before anyone stands on it. Add the formwork itself, the pouring crew, a skip landing faster than planned and the vibrating needle, and the temporary structure underneath is holding close to 750 kg/m². All of that load has to travel from the wet concrete into the panel, across the bearers, down the props and into a floor that may still be gaining strength.
The conclusion first: on concrete slab formwork, two numbers decide whether the pour goes well — the maximum prop spacing and the mid-span deflection of the panel. Once both are checked, the choice between plywood, steel and aluminium becomes a question of reuse, tolerance and transport cost rather than personal preference.
Slab formwork is not a cover laid over the concrete. For the first days after a pour it is the structure that keeps the slab in position while it cures, and the load combination has to cover every one of the following items:
Strength is rarely the limiting factor. Deflection is. Steel and timber in a slab system almost never reach yield, but a panel that sags in the middle takes the soffit level with it. That shows up later as a thin slab, ponding screed or a floor that fails a level survey. The usual working limits are L/360 or 3 mm for the panel, whichever is smaller, and L/270 to L/360 for the supporting members.
Wall and column formwork is designed for the lateral pressure of fresh concrete; a horizontal slab system is not. Applying the wrong rule wastes material or, worse, leaves the vertical load case unchecked.
Four approaches cover most projects, and the differences show up in reuse and soffit quality rather than in the cost of the first pour.
| System | Span between supports | Realistic reuse | Best fit | Main watch-out |
|---|---|---|---|---|
| Plywood on timber bearers | Up to 0.6 m | 5 to 10 pours | Small or irregular slabs, one-off pours | Surface quality drops as the plywood soaks and dents |
| Steel panel with steel bearers | 2 to 4 m | 50 to 200 pours | Repeating floor plates, fair-faced soffits | Higher first cost and heavier manual handling |
| Aluminium panel system | 2 to 4 m | 100+ pours | High-rise standard floors | Lower stiffness and less forgiving of overload |
| Flying table formwork | Full bay | 50+ pours | Repetitive tower floor plans | Needs crane time and a large lay-down area |
Switching from plywood to steel is usually the point where a contractor starts saving money on a repeated floor plate. What steel formwork is and how it behaves on site is covered in more detail in our industry notes.
The panels get the attention, but the load path finishes at the props. A standard adjustable steel prop might carry around 20 kN when barely extended and roughly 10 kN when fully out — a margin that disappears fast when a crew adjusts extension to suit the floor height instead of the design.
Three things control the result:
OEM Steel Props for Heavy-Duty Vertical Load SupportOEM steel props bear vertical loads in formwork and scaffolding, with telescopic height adjustment for support where prop-to-bearer connections must match design assumptions.View Product →
The connection at the top matters just as much. A fork head or U-head jack that captures the bearer and transfers load into the prop is far more reliable than packing with timber wedges, which loosen, drop out or get removed by the next trade. Design assumptions normally treat the prop-to-bearer connection as pinned, so the hardware should match that assumption.
Where a slab is fair-faced, or the same floor plate is poured twenty times, a steel panel usually earns its cost back. The panel decides what the concrete looks like when the formwork comes off, so these parameters belong in the specification before the order is placed.
Foundation Slab Steel Formwork for Large Concrete PoursReinforced steel foundation slab formwork supports deep pours with leak-proof edges and modular assembly, suited to raft, pile cap, and equipment base construction.View Product →
Two smaller habits decide whether a panel survives its hundredth pour: release agent applied thinly and evenly rather than flooded, and stripping at the right moment instead of as early as possible.
Modular Flat Formwork Panels for Fair-Faced Flat PoursStandardized steel flat formwork panels assemble quickly for flat pours, yielding smooth fair-faced surfaces with tight joints and durability for repeated slab work.View Product →These come up again and again on slab packages, and none of them is exotic:
Three numbers should be settled before a supplier quotes, because each one changes the design:
A manufacturer who also cuts and welds its own plate is usually easier to work with on tolerance, because panel flatness, rib spacing and joint detail are controlled in one workshop instead of across three suppliers.
Concrete slab formwork rewards the boring approach: a load combination that covers every case, a prop grid that has been calculated, and hardware that matches the connection assumed in the design. Get those right and the pour becomes a scheduling problem. Get them wrong and it becomes a repair invoice.
If you are comparing panel systems, prop types or a custom set for a specific floor plate, send the drawings and the reuse target so the design can be checked against real capacities rather than a catalogue figure.