+86-13646196162
info@hysonindustry.com
A high-rise curtain wall replacement in the Gulf needed access to a 40-story facade, but the ground floor was a landscaped lobby that could not host a supported scaffold. The project team chose a two-point suspended scaffold because it cou...
READ MOREThree containers of ring lock scaffolding arrived on a Monday. By Wednesday the site crew had rejected two of them — not because the steel was thin or the galvanizing patchy, but because the ledger blades would not seat in the rosettes of ...
READ MORETanzanian Clients Visit Nantong Hyson to Inspect Custom Steel Formwork Production Nantong Hyson Road And Bridge Formwork Co., Ltd. recently welcomed a delegation of clients from Tanzania to its production base. The visit gave our partners a...
READ MOREA 250 mm thick concrete slab weighs about 600 kg per square metre before anyone stands on it. Add the formwork itself, the pouring crew, a skip landing faster than planned and the vibrating needle, and the temporary structure underneath is...
READ MORE